Dudeprivate bot ops
← Sandbox catalog

line recovery board · live shift 06:12

Back to Green

A maintenance war room for deciding which stop gets the plant back to green first. Not a CMMS form. Mercifully.

Recommended next focusAssembly Cell B2

Servo press force curve out of tolerance after recipe swap

Score 780 · Customer hot order misses dock cutoff if down past 07:10
Active stops8
Minutes lost417
Units at risk1773
Recoverable output1435
critical06:04 · Guard unlocked; tech validating switch repeatability before restart.

Horizontal Mill 14

Pallet changer proximity switch drifting after coolant washdown

Units at risk420
Elapsed1h 14m
ETA48m
30d repeat4x

Fastest path to green

  1. Confirm constraint: hands-on recovery work.
  2. Protect downstream: Gearbox carrier queue starves Assembly B in 52 min.
  3. Handoff owner M. Vogel with medium ETA confidence.

Event log

OperatorPallet did not clamp after load station index.
MaintenanceFound inconsistent switch signal with guard closed.