Rev F requested, Rev E nested
Build Passport
One operator-grade release board for geometry risk, machine fit, lot traceability, downstream route, and whether this build should stay parked.
What will stop release
Release coupon review and attach QA signature.
Publish Rev F traveller bundle before nesting freeze.
Approve support variant B or reduce scan angle.
Handoff from intake to release
Module controls
Thin-wall overhang still needs support review.
Chamber reserved, lens calibration complete.
Lot present, qualification coupon not signed.
CT sample plan linked, first-article checklist incomplete.
HIP slot booked, machining route confirmed.
Traveller still references prior CAD package.
Window exists if release occurs before shift handoff.
Last six handoff events
Stage load
Get to a clean release
Activity strip
Machine reservation confirmed on Bay 03
Lot coupon status flipped to pending signature
Revision mismatch detected between traveller and slicer pack
HIP slot held for next-day downstream path
Reference build
Hydraulic Manifold Insert
SLM 280 Cell 02