Posted for NHX pallet 3 with probing macro enabled.
Drawing rev F loaded; model export says rev G notes changed.
Two billets staged on cart B with cert packet.
Tombstone jaws torqued, datum puck swept within 0.006 mm.
T14 8mm long-reach ball missing sister offset and holder.
Thread plug available; bore gauge due back from calibration bench.
Jaw step orientation photo attached to traveler.
Critical bore CMM path ready; thread depth check pending.
Hold start until tool crib and QA clear the open gates.
Machinist must verify hand deburr limit before FAI.
Offset and holder validation required.
CMM program A12_FAI_R7 plus bench thread plug
05:51 · M. FischerDo not press cycle start until T14 is rebuilt and QA confirms bore gauge tag.